The Bengaluru airport corridor: getting groups in and out
By Le Roma Hotels & Resorts | Updated
Kempegowda International Airport sits north of Bengaluru on National Highway 44, the Bellary Road corridor that runs south through Devanahalli, Bagalur Cross, Yelahanka and Hebbal into the city.
Published by Le Roma Hotels & Resorts. Le Roma operates the properties discussed on this site. Partner relationships are labelled.

Why the corridor matters for a group
A wedding family or a delegation landing at Kempegowda has one decision that shapes the rest of the trip: whether the venue is on the airport side of the city or across it. The four Le Roma properties all sit on the north side. Their published drive times from the airport are on Find a Venue, and each one is the property’s own figure rather than a map estimate.
Everything south of Hebbal adds the city to the journey. That is the trade-off the corridor comparison in the journal works through; this page covers the logistics once you have chosen north.
Ground transport from the terminal
The airport’s Vayu Vajra service is BMTC’s air-conditioned bus link between the terminals and the city, with dedicated luggage space. According to the airport, the buses operate from the mezzanine level of the Terminal 2 multi-modal transport hub with staging at Terminal 1, and accept cash or UPI on boarding. Routes fan out to Kempegowda Bus Station (Majestic), Hebbal and the main residential belts; check the current route list before relying on one for a group, since schedules change.
For a group with luggage, pre-booked vehicles in waves are the practical answer. The group arrival and airport-transfer guide in Planning Tools sets out how to batch arrivals and what to give drivers.
- Bus: Vayu Vajra from Terminal 2’s transport hub; cash or UPI on board.
- Taxi and app cabs: available from the designated pick-up areas at both terminals.
- Pre-booked group vehicles: brief the driver with the venue name, the wave time and a meeting-point photo.
Metro: not yet
The Blue Line of Namma Metro is planned to run from Central Silk Board to the airport terminals via KR Puram, Hebbal, Yelahanka and Bagalur Cross. As of the 7 September 2026 revision of its Wikipedia article it is entirely under construction, with Phase 2A (Silk Board to KR Puram) expected in December 2027 and Phase 2B (KR Puram to the airport) in March 2028. Do not plan a 2026 or 2027 event around it.
Practical notes
- Test the drive at the hour your guests will actually travel; corridor traffic differs sharply between a weekday morning and a Saturday evening.
- Give every arriving guest one WhatsApp contact for arrivals only.
- For Aero India weeks at Yelahanka, book rooms early: the airbase sits on this corridor and the show fills the area. See the Yelahanka guide.
Sources
- Kempegowda International Airport — Vayu Vajra bus service — accessed 22 September 2026
- BMTC — Airport Vayu Vajra services — accessed 22 September 2026
- Wikipedia — Blue Line (Namma Metro), revision of 7 September 2026 — accessed 22 September 2026
- Le Roma facts registry (property drive times as published by each property) — accessed 22 September 2026
Property figures (rooms, capacities, drive times) come from the Le Roma facts registry and each property’s published data. Transport plans change; check the operator before relying on a schedule.
Group arrival and airport-transfer guide
Group arrival and airport-transfer guide →